
Boeing already provides simulation training for the crews of India’s C-17 heavy-lift and P-8I maritime aircraft, which are both also under Performance Based Logistics contracts to guarantee availability of platforms.

The acquisition of the S-400, differing points of view on the war in Ukraine, eye-watering costs, a domestic 5th gen fighter program and never having operated any U.S. fighter aircraft are some of the reasons why India can’t and shouldn’t consider the Lockheed Martin F-35 Lightning II Joint Strike Fighter.
India is going to be disappointed with President Barack Obama’s visit beginning Saturday after next. The upside of this is that the Indo-US relationship has come a long way in so short a time as to engender expectations that could induce performance anxiety.